CAD CAM EDM DRO - Yahoo Group Archive

Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts

on 2001-06-29 15:10:38 UTC
Hi Chris,

3:1 sounds good to me, I have a new RF-31 too, but not near a CNC
conversion yet. What ballscrews did you choose? I was thinking of
steppers, but as I don't have them yet, servos might be a possibility.

Alan KM6VV

Christopher Prosser wrote:
>
> Hi Folks,
> I'm sitting here, stuck in my house reclining with a bad back. So I
> thought I'd run some numbers trying to decide if I wanted to do a 2:1 or 3:1
> reduction from the motor to the leadscrew (or ballscrew when I get around to
> upgrading).
>
> I'm using G320 drivers with EMC. I picked up a servo motor with a 250cpr
> encoder on it from Dan Mauch.
>
> I'd make a nice table, but this is ascii after all.
>
> Assumptions:
> EMC can only do 5KHz for driving the steppers. Does anyone know if freqmod
> will do faster?
>
> The gecko drives will take up to 25KHz for step input. They will fault out
> at +/- 128 counts.
>
> The motor therefore can run at 1200 rpm with a 5KHz input, giving 600rpm, or
> 400rpm at the lead screw.
>
> My lead screws are 10tpi (RF-31).
>
> 2:1 drive ratio
> Max err before fault: +/- 0.0254
> Max table speed at 5KHz pulse rate: 60ipm
>
> 3:1 drive
> max err: +/- 0.0169
> Max table speed at 5KHz pulse rate: 40ipm
>
> I'm probably going with the 3:1 drive.
>
> Just thought I'd share.
> --chris prosser

Discussion Thread

Christopher Prosser 2001-06-29 12:18:07 UTC pulley ratios for timing belts mariss92705@y... 2001-06-29 12:32:22 UTC Re: pulley ratios for timing belts Tim Goldstein 2001-06-29 12:43:00 UTC RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Christopher Prosser 2001-06-29 13:00:31 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Tim Goldstein 2001-06-29 14:10:19 UTC RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Alan Marconett KM6VV 2001-06-29 15:10:38 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Tim Goldstein 2001-06-29 15:33:32 UTC RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Alan Marconett KM6VV 2001-06-29 16:22:45 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Sven Peter, TAD S.A. 2001-06-29 19:56:07 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Jon Elson 2001-06-29 21:25:00 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Tim Goldstein 2001-06-29 22:46:00 UTC RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts Jon Elson 2001-06-30 10:48:27 UTC Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts