Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Posted by
Alan Marconett KM6VV
on 2001-06-29 16:22:45 UTC
Hi Tim,
Well, actually I DO have a pair of Gecko 210's (waiting to get the
second pair), but I was thinking of sharing them with the Sherline
mill. Probably easier to have separate driver boxes, anyway. I hadn't
figured out an easy way to switch between both sets of steppers, change
the gain, etc. ;>)
Alan KM6VV
Tim Goldstein wrote:
Well, actually I DO have a pair of Gecko 210's (waiting to get the
second pair), but I was thinking of sharing them with the Sherline
mill. Probably easier to have separate driver boxes, anyway. I hadn't
figured out an easy way to switch between both sets of steppers, change
the gain, etc. ;>)
Alan KM6VV
Tim Goldstein wrote:
>
> If you don't have any of the parts required for steppers yet than just go
> with G320's and servo motors. You will not regret it.
>
> Tim
> [Denver, CO]
>
> > -----Original Message-----
> >
> > Hi Chris,
> >
> > 3:1 sounds good to me, I have a new RF-31 too, but not near a CNC
> > conversion yet. What ballscrews did you choose? I was thinking of
> > steppers, but as I don't have them yet, servos might be a possibility.
Discussion Thread
Christopher Prosser
2001-06-29 12:18:07 UTC
pulley ratios for timing belts
mariss92705@y...
2001-06-29 12:32:22 UTC
Re: pulley ratios for timing belts
Tim Goldstein
2001-06-29 12:43:00 UTC
RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Christopher Prosser
2001-06-29 13:00:31 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Tim Goldstein
2001-06-29 14:10:19 UTC
RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Alan Marconett KM6VV
2001-06-29 15:10:38 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Tim Goldstein
2001-06-29 15:33:32 UTC
RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Alan Marconett KM6VV
2001-06-29 16:22:45 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Sven Peter, TAD S.A.
2001-06-29 19:56:07 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Jon Elson
2001-06-29 21:25:00 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Tim Goldstein
2001-06-29 22:46:00 UTC
RE: [CAD_CAM_EDM_DRO] pulley ratios for timing belts
Jon Elson
2001-06-30 10:48:27 UTC
Re: [CAD_CAM_EDM_DRO] pulley ratios for timing belts