Re: estimating machining time
Posted by
Ray Henry
on 2002-10-16 16:08:18 UTC
The EMC backplotter is real time. I did make a special ini with about
1/10 the steps and much faster speed so that I could get around those 3
hour contouring jobs in a few minutes.
Ray
1/10 the steps and much faster speed so that I could get around those 3
hour contouring jobs in a few minutes.
Ray
> From: "awallin25" <anders.wallin@...>
> Subject: estimating machining time
>
>
>
> Is there an easy way to estimate how long a g-code program will run??
> (automatically calculate toolpath length and divide by feedrate)
> I tried running EMC with only the backplotter active, no movement of
> the table, but this is a kind of slow way...
Discussion Thread
awallin25
2002-10-16 11:38:26 UTC
estimating machining time
John Branlund
2002-10-16 11:51:19 UTC
Re: [CAD_CAM_EDM_DRO] estimating machining time
Ray Henry
2002-10-16 16:08:18 UTC
Re: estimating machining time