EMC and Z axis
Posted by
Wally K
on 2000-11-26 08:34:54 UTC
I was thinking of getting the X and Y axis working first on my
bridgeport and doing Z later. Is EMC setup so it can stop and wait
for manual operation of Z axis, and proceed after the operator hits a
key.
Wally K.
bridgeport and doing Z later. Is EMC setup so it can stop and wait
for manual operation of Z axis, and proceed after the operator hits a
key.
Wally K.
Discussion Thread
Wally K
2000-11-26 08:34:54 UTC
EMC and Z axis
Matt Shaver
2000-11-26 12:53:05 UTC
Re: [CAD_CAM_EDM_DRO] EMC and Z axis
Jon Elson
2000-11-27 00:15:17 UTC
Re: [CAD_CAM_EDM_DRO] EMC and Z axis