flash cut canned cycles
Posted by
carlcnc
on 2002-04-15 11:02:07 UTC
Is it normal for Flashcut controller to have a delay each time you
move to a new position when using G83?
The point to point moves are fine but once there I get approx a 1.5
sec pause before the drilling routine starts,then another delay after
final peck and before the move to next location.
Running on a P333 laptop W98.
As we are drilling 250-400 holes for cribbage boards these "pauses"
add up to 20 min!
thanks
Carl
move to a new position when using G83?
The point to point moves are fine but once there I get approx a 1.5
sec pause before the drilling routine starts,then another delay after
final peck and before the move to next location.
Running on a P333 laptop W98.
As we are drilling 250-400 holes for cribbage boards these "pauses"
add up to 20 min!
thanks
Carl
Discussion Thread
carlcnc
2002-04-15 11:02:07 UTC
flash cut canned cycles
Dan Mauch
2002-04-15 12:36:00 UTC
RE: [CAD_CAM_EDM_DRO] 802 oz in stepper group buy
doug98105
2002-04-15 13:22:50 UTC
Re: flash cut canned cycles
RC
2002-04-15 15:35:45 UTC
Re: [CAD_CAM_EDM_DRO] flash cut canned cycles
carlcnc
2002-04-15 18:49:55 UTC
Re: flash cut canned cycles