CAD CAM EDM DRO - Yahoo Group Archive

Re: screening

Posted by keongsan
on 2002-09-24 05:49:27 UTC
Jon Elson <elson@p...> wrote:

> everything with interference. The braided wire shield is more
durable
> over the long term with much cable flexing

With 3 2-wire braided cable for 3 axis driver, one end at DB25, other
ends at step-dirn terminals of the 3 separate drives, to which end
does one connect the earth shield - at the DB25 or at the earth of
the individual drives?

If at the DB25, we will have 3 separate braids coming out of the ends
of the signal cable. How do we connect it (professionally looking) to
the connector?

Thanks

Keongsan

Discussion Thread

alex0young 2002-09-21 07:46:26 UTC screening JJ 2002-09-21 09:43:40 UTC RE: [CAD_CAM_EDM_DRO] screening Carol & Jerry Jankura 2002-09-21 09:56:36 UTC RE: [CAD_CAM_EDM_DRO] screening Jon Elson 2002-09-21 21:31:00 UTC Re: [CAD_CAM_EDM_DRO] screening w.higdon@a... 2002-09-22 08:58:25 UTC Re: [CAD_CAM_EDM_DRO] screening keongsan 2002-09-24 05:49:27 UTC Re: screening JJ 2002-09-24 17:33:07 UTC RE: [CAD_CAM_EDM_DRO] Re: screening