Re: screening
Posted by
keongsan
on 2002-09-24 05:49:27 UTC
Jon Elson <elson@p...> wrote:
ends at step-dirn terminals of the 3 separate drives, to which end
does one connect the earth shield - at the DB25 or at the earth of
the individual drives?
If at the DB25, we will have 3 separate braids coming out of the ends
of the signal cable. How do we connect it (professionally looking) to
the connector?
Thanks
Keongsan
> everything with interference. The braided wire shield is moredurable
> over the long term with much cable flexingWith 3 2-wire braided cable for 3 axis driver, one end at DB25, other
ends at step-dirn terminals of the 3 separate drives, to which end
does one connect the earth shield - at the DB25 or at the earth of
the individual drives?
If at the DB25, we will have 3 separate braids coming out of the ends
of the signal cable. How do we connect it (professionally looking) to
the connector?
Thanks
Keongsan
Discussion Thread
alex0young
2002-09-21 07:46:26 UTC
screening
JJ
2002-09-21 09:43:40 UTC
RE: [CAD_CAM_EDM_DRO] screening
Carol & Jerry Jankura
2002-09-21 09:56:36 UTC
RE: [CAD_CAM_EDM_DRO] screening
Jon Elson
2002-09-21 21:31:00 UTC
Re: [CAD_CAM_EDM_DRO] screening
w.higdon@a...
2002-09-22 08:58:25 UTC
Re: [CAD_CAM_EDM_DRO] screening
keongsan
2002-09-24 05:49:27 UTC
Re: screening
JJ
2002-09-24 17:33:07 UTC
RE: [CAD_CAM_EDM_DRO] Re: screening