CAD CAM EDM DRO - Yahoo Group Archive

Re: [CAD_CAM_EDM_DRO] EMC2 requirements.

Posted by Brian Worth
on 2008-08-26 09:00:20 UTC
Hi folks, here is a link to emc software on puppy linux - a bootable cd, and only about 80 mB download.
http://www.thecooltool.com/downloads.php?language=e&status=20&id=72

Regards, Brian

--- On Tue, 26/8/08, Lester Caine <lester@...> wrote:
From: Lester Caine <lester@...>
Subject: Re: [CAD_CAM_EDM_DRO] EMC2 requirements.
To: CAD_CAM_EDM_DRO@yahoogroups.com
Date: Tuesday, 26 August, 2008, 10:15 AM

Jon Elson wrote:
> Kim Mortensen wrote:
>> Jon,
>>
>> I dont what other differences there is, but I could not instal it on the 256
>> Mb, so there must be other dependencies. ..
>>
>> I could run the Live CD without installing, but when I tried to install, it
>> would slow down and use the CD rom extreamly much to the end where it would
>> just not react to human intervention, and just keep the CD-Rom running.
>>
> Yup, matches my experience. What is happening is there is no
> swap file when installing, so it is paging out loaded code
> modules and then immediately paging them back in from CD.
> It would eventually finish, but that could literally take years.
>> Put in the ram, and it worked like a treat... (-:
>>
>> But I have also hear others that have installed on low memory machines.. but
>> I have no clue how they did it (-:
> I didn't do anything special, and I have some machines that will
> NOT install with 256 MB. I suspect the more I/O drivers it
> loads to match all the available hardware makes a difference.
> Since it has a hard drive available, it COULD create the swap
> file and start using it for a hard drive install, and that would
> likely solve the problem. Then, it could page out data as well
> as the pure code modules.

You have to ignore the 'big boys' that are trying to mimic M$
http://www.damnsmal llinux.org/ ( but there are others )
Just need the right bits from EMC2 ;)

--
Lester Caine - G8HFL
------------ --------- --------
Contact - http://lsces. co.uk/lsces/ wiki/?page= contact
L.S.Caine Electronic Services - http://lsces. co.uk
EnquirySolve - http://enquirysolve .com/
Model Engineers Digital Workshop - http://medw. co.uk//
Firebird - http://www.firebird sql.org/index. php


Send instant messages to your online friends http://uk.messenger.yahoo.com

[Non-text portions of this message have been removed]

Discussion Thread

jbrennan3@a... 2008-07-02 12:18:15 UTC Re: [CAD_CAM_E DM_DRO] Vacuum pump for vacuum chuck? John Dammeyer 2008-08-24 17:51:42 UTC EMC2 requirements. Stephen Wille Padnos 2008-08-24 18:32:51 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. John Dammeyer 2008-08-24 19:57:54 UTC RE: [CAD_CAM_EDM_DRO] EMC2 requirements. Lester Caine 2008-08-25 02:47:03 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Kim Mortensen 2008-08-25 05:04:18 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Stephen Wille Padnos 2008-08-25 06:53:27 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Jon Elson 2008-08-25 09:00:51 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Kim Mortensen 2008-08-25 10:01:30 UTC RE: [CAD_CAM_EDM_DRO] EMC2 requirements. Jon Elson 2008-08-25 18:40:40 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Lester Caine 2008-08-26 00:15:58 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Kim Mortensen 2008-08-26 00:25:06 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements. Brian Worth 2008-08-26 09:00:20 UTC Re: [CAD_CAM_EDM_DRO] EMC2 requirements.