CAD CAM EDM DRO - Yahoo Group Archive

Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates

Posted by caedave
on 2005-11-05 01:59:54 UTC
Adding another one here I think!! It's been a while so I'm not
sure of the series.

Table was about 40" x 12" with 5 Tslots, "X" travel about 36",
"Y" about 30" and "Z" 6".

Bridgeport Works retro fit, used Anilam Crusader Control
which was a fully closed loop control, very good when it
worked but we blow a lot of Y axis driver cards (7 in 2 years)
which Bridgeport's engineers only resolved by replacing
the whole controller unit.

DC tooth belt drives with shaft encoders for speed and
linier encoders for position on the X and Y, direct shaft
drive on the Z using linier encoder for position and software
positional feedback for speed.

The knee was left manual and with no power assist and
manual lever lock.

X and Y manual handles refitted after the shafts and nuts
where changed. It was therefore possible to use the
machine as a manual machine by utilising the knee for
Z moves.

Last job it did before being sold on was re-machining
a BR Black 5 Steam Loco's expansion links for the
Seven Valley Railway
(one of the other lecturers was a volunteer driver for the SVR)

----- Original Message -----
From: "Les Newell" <lesnewell@...>
Subject: Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC
Refit Candidates


> Those are the manual machines (apart from the EZ trak which was a beast
> on it's own). The CNCs are very different. The Series 1 CNC is based on
> the manual machines with a special rigid ram, often using 30 series
> quick change tooling. Drive is via a varispeed belt from a 3 phase motor.
> The Series 2 CNC is an altogether bigger beast and AFAIK there isn't a
> manual equivalent. They usually take ISO 40 tooling with a pneumatic
> drawbar. If I remember correctly drive is toothed belt from a DC motor.
>
> Les



--
No virus found in this outgoing message.
Checked by AVG Free Edition.
Version: 7.1.362 / Virus Database: 267.12.8/161 - Release Date: 03/11/2005

Discussion Thread

jacoby01 2005-11-04 04:00:26 UTC Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 04:47:05 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates jacoby01 2005-11-04 05:03:06 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture turbulatordude 2005-11-04 05:21:12 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture Les Newell 2005-11-04 05:59:45 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 07:15:57 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 07:44:28 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 08:17:18 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Craig Stevens 2005-11-04 09:15:13 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-04 10:01:35 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-04 10:05:45 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture Jon Elson 2005-11-04 10:07:36 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 11:05:32 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 14:34:00 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Jeff Goldberg 2005-11-04 14:44:50 UTC RE: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 16:13:15 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Polaraligned 2005-11-04 17:14:45 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 17:50:19 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 17:52:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Peter Reilley 2005-11-04 17:55:10 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 18:13:47 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates caedave 2005-11-05 01:59:54 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates JCullins 2005-11-05 05:37:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-05 09:28:18 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 09:58:07 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:05:03 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:07:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:10:41 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:13:07 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-05 13:48:03 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates ddfalck2002 2005-11-05 14:17:14 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates caedave 2005-11-05 15:51:53 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Polaraligned 2005-11-05 16:58:19 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Mike Delany 2005-11-05 19:32:05 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 20:08:27 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-06 03:00:08 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Steve Haushahn 2005-11-06 08:34:38 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-06 12:13:15 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates deepcavity@h... 2005-11-06 18:11:13 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Stephen Wille Padnos 2005-11-06 18:54:36 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-06 19:28:20 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-06 19:38:55 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates