CAD CAM EDM DRO - Yahoo Group Archive

Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates

Posted by JCullins
on 2005-11-05 05:37:48 UTC
----- Original Message -----
From: "caedave" <caedave@...>
To: <CAD_CAM_EDM_DRO@yahoogroups.com>
Sent: Saturday, November 05, 2005 3:57 AM
Subject: Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC
Refit Candidates


> Adding another one here I think!! It's been a while so I'm not
> sure of the series.
>
> Table was about 40" x 12" with 5 Tslots, "X" travel about 36",
> "Y" about 30" and "Z" 6".
>
> Bridgeport Works retro fit, used Anilam Crusader Control
> which was a fully closed loop control, very good when it
> worked but we blow a lot of Y axis driver cards (7 in 2 years)
> which Bridgeport's engineers only resolved by replacing
> the whole controller unit.
>
> DC tooth belt drives with shaft encoders for speed and
> linier encoders for position on the X and Y, direct shaft
> drive on the Z using linier encoder for position and software
> positional feedback for speed.
>
> The knee was left manual and with no power assist and
> manual lever lock.
>
> X and Y manual handles refitted after the shafts and nuts
> where changed. It was therefore possible to use the
> machine as a manual machine by utilising the knee for
> Z moves.
>
> Last job it did before being sold on was re-machining
> a BR Black 5 Steam Loco's expansion links for the
> Seven Valley Railway
> (one of the other lecturers was a volunteer driver for the SVR)
>
> ----- Original Message -----
> From: "Les Newell" <lesnewell@...>
> Subject: Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC
> Refit Candidates
>
>
>> Those are the manual machines (apart from the EZ trak which was a beast
>> on it's own). The CNCs are very different. The Series 1 CNC is based on
>> the manual machines with a special rigid ram, often using 30 series
>> quick change tooling. Drive is via a varispeed belt from a 3 phase motor.
>> The Series 2 CNC is an altogether bigger beast and AFAIK there isn't a
>> manual equivalent. They usually take ISO 40 tooling with a pneumatic
>> drawbar. If I remember correctly drive is toothed belt from a DC motor.
>>
>> Les
>
>
>
> --
> No virus found in this outgoing message.
> Checked by AVG Free Edition.
> Version: 7.1.362 / Virus Database: 267.12.8/161 - Release Date: 03/11/2005
>
>
>
> Addresses:
> FAQ: http://www.ktmarketing.com/faq.html
> FILES: http://groups.yahoo.com/group/CAD_CAM_EDM_DRO/files/
> Post Messages: CAD_CAM_EDM_DRO@yahoogroups.com
>
> Subscribe: CAD_CAM_EDM_DRO-subscribe@yahoogroups.com
> Unsubscribe: CAD_CAM_EDM_DRO-unsubscribe@yahoogroups.com
> List owner: CAD_CAM_EDM_DRO-owner@yahoogroups.com, wanliker@...,
> timg@...
> Moderator: pentam@... indigo_red@... davemucha@...
> [Moderators]
> URL to this group: http://groups.yahoo.com/group/CAD_CAM_EDM_DRO
>
> OFF Topic POSTS: General Machining
> If you wish to post on unlimited OT subjects goto:
> aol://5863:126/rec.crafts.metalworking or go thru Google.com to reach it
> if you have trouble.
> http://www.metalworking.com/news_servers.html
>
> http://groups.yahoo.com/group/jobshophomeshop I consider this to be a
> sister site to the CCED group, as many of the same members are there, for
> OT subjects, that are not allowed on the CCED list.
>
> NOTICE: ALL POSTINGS TO THIS GROUP BECOME PUBLIC DOMAIN BY POSTING THEM.
> DON'T POST IF YOU CAN NOT ACCEPT THIS.....NO EXCEPTIONS........
> bill
> List Mom
> List Owner
>
>
> Yahoo! Groups Links
>
>
>
>
>
>

Discussion Thread

jacoby01 2005-11-04 04:00:26 UTC Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 04:47:05 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates jacoby01 2005-11-04 05:03:06 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture turbulatordude 2005-11-04 05:21:12 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture Les Newell 2005-11-04 05:59:45 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 07:15:57 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 07:44:28 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 08:17:18 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Craig Stevens 2005-11-04 09:15:13 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-04 10:01:35 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-04 10:05:45 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates - Picture Jon Elson 2005-11-04 10:07:36 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 11:05:32 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates turbulatordude 2005-11-04 14:34:00 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Jeff Goldberg 2005-11-04 14:44:50 UTC RE: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 16:13:15 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Polaraligned 2005-11-04 17:14:45 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 17:50:19 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates R Rogers 2005-11-04 17:52:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Peter Reilley 2005-11-04 17:55:10 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-04 18:13:47 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates caedave 2005-11-05 01:59:54 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates JCullins 2005-11-05 05:37:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-05 09:28:18 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 09:58:07 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:05:03 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:07:48 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:10:41 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 10:13:07 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-05 13:48:03 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates ddfalck2002 2005-11-05 14:17:14 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates caedave 2005-11-05 15:51:53 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Polaraligned 2005-11-05 16:58:19 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates Mike Delany 2005-11-05 19:32:05 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Jon Elson 2005-11-05 20:08:27 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-06 03:00:08 UTC Re: [CAD_CAM_EDM_DRO] Re: Bridgeport Series I verse Series II CNC Refit Candidates Steve Haushahn 2005-11-06 08:34:38 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates Les Newell 2005-11-06 12:13:15 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates deepcavity@h... 2005-11-06 18:11:13 UTC Re: [CAD_CAM_EDM_DRO] Bridgeport Series I verse Series II CNC Refit Candidates Stephen Wille Padnos 2005-11-06 18:54:36 UTC Re: [CAD_CAM_EDM_DRO] Re: Re: Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-06 19:28:20 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates vavaroutsos 2005-11-06 19:38:55 UTC Re: Bridgeport Series I verse Series II CNC Refit Candidates